
Solutions / Oil & Gas
Eliminate diesel operating cost at the remote wellsite.
Diesel fuel, transportation, and maintenance at remote O&G operations are among the largest ongoing operating line items. The SES System pairs with your existing genset to reduce fuel consumption — no rewiring, no replacing existing infrastructure, no operational disruption.
Talk to a Field SpecialistThe Problem
At a remote well site, diesel fuel cost, logistics, and generator maintenance represent a predictable, recurring expense that scales with uptime. Regulatory pressure on emissions adds compliance cost on top.
The SES System does not replace your diesel generator. It reduces how often it runs — cutting fuel consumption, extending service intervals, and reducing the logistical burden of fuel supply to remote locations.
Why This Is Different From Solar That's Been Tried
Flat-panel solar installations at remote O&G sites have consistently underdelivered. Insufficient power density for the footprint. Degraded output at low sun angles. Fragility in harsh operating conditions. The industry has legitimate reasons to be skeptical.
SunDog is not flat-panel solar. It uses concentrating optics and full-arc sun-tracking to deliver consistently higher energy output per square foot — in the same environments where static panels have failed.
See how CPV differs from flat-panel solar →Integration
Drop-in alongside your existing genset
No rewiring. No replacing existing infrastructure. The SES System pairs with diesel, battery, or grid — whichever you already operate.
Sized for your load
From a single BESSe module for instrumentation to a full 10-module platform for pumps and processing equipment.
No operational disruption
The SES System supplements your genset. The genset keeps running as backup. You reduce how often it runs — not whether it can.
Data-logged performance
Fuel reduction, solar contribution, and load data available for ESG reporting and operational cost tracking.
Economics
The numbers depend on your site. We'll run them for you.
Fuel cost per site varies significantly by location, consumption, and logistics. We model ROI against your specific operating parameters — fuel price, transport cost, genset runtime, and load profile — as part of the technical evaluation process.
Request Site Economics AnalysisField Evaluation Program
Evaluate the SES System on your terms.
We are accepting qualified O&G operators for field evaluation partnerships in 2026. You define the test parameters, the site, and the success criteria. We provide the system, the data, and the technical support.
Talk to a Field Specialist